Landed Kitchen & 2 Bathrooms ($26,888)

Package Includes:

  • Supply labour & equipment to hack & demolish floor and wall tiles for kitchen

  • Supply labour & equipment to hack & dismantle existing kitchen cabinet.

  • Supply labour & equipment to hack and dismantle all wall fittings & clothes hanger at kitchen only.

  • Supply labour & equipment to hack and demolish floor and wall tiles for both bathrooms

  • Supply labour & equipment to hack & dismantle all sanitary ware, wall fittings and doors for both bathrooms only.

  • Provide haulage for uploading and unloading of all materials and debris.

  • Provide labour & transport for removal of all debris to NEA designated dumping ground

  • Supply labour & materials to lay waterproofing membrane for kitchen floor only.

  • Supply labour & materials to lay waterproofing membrane for both bathroom floors only.

  • Supply labour & materials to do cement screeding for kitchen flooring only.

  • Supply labour & materials to lay full height wall tiles with the price below $2.20 psf for kitchen only.

  • Supply labour & materials to lay floor tiles with the tile price below $2.20 psf for kitchen only.

  • Supply labour & materials to construct mortar base for kitchen cabinets only.

  • Supply labour & materials to lay cement screeding for both bathrooms flooring only

  • Supply labour & materials to lay floor tiles with tile price below $2.20 psf for both bathrooms.

  • Supply labour & materials to lay full height wall tiles with the price below $2.20 psf for both bathrooms

  • Supply labour & materials to install top & bottom track Aluminium bi-fold doors for both bathrooms

  • Supply labour & materials to run new stainless steel cold water pipe to kitchen & both bathrooms only.

  • Supply labour & materials to re-wire kitchen & both bathrooms using back existing points after completion of wet works.

  • Design & fabricate 10 ft bottom kitchen cabinet in solid plywood, laminated finishing and ABS trimmings.

  • Design & fabricate 10 ft solid surface work top for kitchen cabinet only.

  • Provide chemical washing after completion of all renovation works.

  • Floor plan layout.

  • Materials and color proposal cum selection.

  • Site co-ordination and supervision..

  • Application of permit from relevant authorities.

  • Interior design and space planning.

  • 3D perspective drawings

  • Supply labour only to install 1 set of kitchen sink. 2 sets of toilet bowls, 2 sets of bathroom accessories,
    2 sets of bidet sprays, 2 sets of instant heater & 2 sets of wash basins